Penyuluhan Dan Instalasi Kelistrikan Pada Mesin Pemisah Kulit Ari Kedelai UMKM Produksi Tempe Tradisional Di Desa Wringinpitu Banyuwangi

  • Adi Pratama Putra Universitas PGRI Banyuwangi

Abstract

Problems found in related to electrical installations in buildings/houses are not arranged perfectly or the installation is not following to the procedure because there have been improvements to the electrical installations of the building or house beforehand. Electrical installations that will be installed should also consider the concept of savings and costs Installation and addition of electrical installations with equipment that is not based on knowledge of electrical installations can be dangerous if not carried out by save maintenance and security of existing electrical equipment. Based on the situation analysis of MSME traditional tempe producers that have a separator machine using an electric motor, there is a need for a good and correct electrical installation to prevent the user avoid from electrical shock that could be potentially dangerous, because the separator from the soybean skin is a direct contact with water. The method of implementation in community service activities at Tempe producers MSMEs include; Field Observation, Tool Design, Tool Assembly, Tool Testing, Tool Installation, Electricity Installation, Electricity and Operation Training, and MONEV. The results of a series of community service activities that have been carried out are being able to increase the knowledge of all who are on the business purposes to understand how electricity and good installation are save from an unwanted thing about electricity.

Author Biography

Adi Pratama Putra, Universitas PGRI Banyuwangi

Jurusan Teknik Mesin

References

[1]. Andersen. 2018. Penataan Dan Pengembangan Instalasi Listrik
Fakultas Teknik UNSRAT 2017. Jurnal Teknik Elektro dan Komputer Vol. 7 No. 3, Juli-Oktober 2018.
[2]. Alfith, (2013), Kriteria kelaikan instalasi dibuat sesuai dengan standard yang berlaku yaitu PUIL 2000, Jurnal Teknik Eletro ITP, Volume 2 No. 2, Juli 2013, halaman 68 – 70, ITB.Bandung.
[3]. S Bahraen. 2018. Evaluasi Sistem Instalasi Listrik Di Gedung B
Kampus Fakultas Teknik Universitas Mataram, Jurnal eprints.unram.
[4]. Badan Perencanaan Pembangunan Daerah Pemerintah Kabupaten Banyuwangi. 2013. Peran Koperasi Dalam Mendukung Pengembangan dan Penguatan UMKM di Kabupaten Banyuwangi. Laporan Akhir.
[5]. Asian Productivity Organization, 2003, A Measurement Guide to Green Productivity, APO, Tokyo.
[6]. Asian Productivity Organization, 2008, Productivity Databook, APO, Tokyo.
Published
2019-10-24
How to Cite
PUTRA, Adi Pratama. Penyuluhan Dan Instalasi Kelistrikan Pada Mesin Pemisah Kulit Ari Kedelai UMKM Produksi Tempe Tradisional Di Desa Wringinpitu Banyuwangi. JATI EMAS (Jurnal Aplikasi Teknik dan Pengabdian Masyarakat), [S.l.], v. 3, n. 2, p. 155-158, oct. 2019. ISSN 2550-0821. Available at: <http://journal.fdi.or.id/index.php/jatiemas/article/view/243>. Date accessed: 24 jan. 2020.

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.